Current transformer installation location

Jun 20, 2026 Leave a message

The deployment of current transformers in power systems primarily considers conductor type and monitoring targets:

 

Inside distribution cabinets: Typically fixed at the outgoing terminals of circuit breakers, working with energy meters to achieve branch metering.

 

Bus trunking: Employs an open structure that snaps onto the busbars; careful attention must be paid to three-phase balanced installation.

 

Cable joints: A through-hole design allows direct cable connection; suitable for retrofit projects.

 

Key difference: Bus trunking installation requires consideration of electromagnetic interference, while cable joint installation prioritizes sealing and protection.

Send Inquiry